logo  ST. CHARLES PARISH, LA
File #: 2013-0104    Version: 1 Name: Contract for Engineering Services with Campo Designs - Architects for Public Works Office Storm Window Retrofit Project
Type: Ordinance Status: Enacted
File created: 3/25/2013 In control: Parish Council
On agenda: Final action: 4/8/2013
Enactment date: 4/8/2013 Enactment #: 13-4-4
Title: An ordinance to approve and authorize the execution of a Contract for Engineering Services with Campo Designs - Architects for necessary professional engineering services associated with Parish Project No. P130103 St Charles Parish Public Works Office Storm Window Retrofit Project.
Sponsors: V.J. St. Pierre Jr., Department of Public Works
Indexes: Administrative Agreements, Grants, Public Works (Dept. of) (Storm Window Retrofit Proj.)
Attachments: 1. 2013-0104 Contract-F, 2. 2013-0104 Final Ord 13-4-4 with Contract
Related files: 2014-0013, 2013-0324
2013-0104
INTRODUCED BY:      V.J. ST. PIERRE, JR., PARISH PRESIDENT
                  (DEPARTMENT OF PUBLIC WORKS)
ORDINANCE NO.                    
Title
An ordinance to approve and authorize the execution of a Contract for Engineering Services with Campo Designs - Architects for necessary professional engineering services associated with Parish Project No. P130103 St Charles Parish Public Works Office Storm Window Retrofit Project.
Body
WHEREAS,      the St. Charles Parish Council desires to have the following described projects undertaken:
PROJECT DESCRIPTION:
Engineering Services for Parish Project No. P130103 St Charles Parish Public Works Office Storm Window Retrofit Project. The service will include but will not be limited to serving as Owner's professional engineering/architectural representative for the Project, providing professional engineering consultation and advice, and furnishing customary architectural, civil, geotechnical, structural, mechanical, electrical, instrumentation and control engineering services and construction engineering and inspection; and,
WHEREAS, the opinion of probable project budget is as follows:
      Engineering Services (Basic and Inspection)                  $         34,660.00
      Construction                                                $       214,333.00
      Other Project Cost                                          $         21,433.00
            Advertising, Recordation, Land Acquisition,
            Right-of-Ways, Permits, Surveying, Soil Testing, etc.                 
                  TOTAL PROJECT BUDGET                  $       270,426.00
THE ST. CHARLES PARISH COUNCIL HEREBY ORDAINS:
      SECTION I.      That the attached contract for Engineering Services between Campo Designs - Architects and the Parish of St. Charles is hereby approved.
      SECTION II.      That the Parish President is hereby authorized to execute said contract on behalf of the Parish of St. Charles.
SECTION III.
A.      That the necessary funds for the total project budget in the amount $270,426.00 be allocated to the above described project and appropriated from the Roads and Drainage (112) Fund.
B.      That $ 160,749.98 in Project funding is provided from FEMA federal funds available to the State of Louisiana under the Legislative Pre- Disaster Mitigation Competitive (PDMC) grant program CFDA # 97.047.
Vote
The foregoing ordinance having been submitted to a vote, the vote thereon was as follows:
 
 
 
 
      And the ordinance was declared adopted this ______ day of ___________, 2013 to become effective five (5) days after publication in the Official Journal.
 
 
 
CHAIRMAN:______________________________________________
SECRETARY:_____________________________________________
DLVD/PARISH PRESIDENT:_________________________________
APPROVED:______________ DISAPPROVED:__________________
 
PARISH PRESIDENT:______________________________________
RETD/SECRETARY:_______________________________________
AT:_______________ RECD BY: _____________________________