logo  ST. CHARLES PARISH, LA
File #: 2009-0424    Version: Name: Amend Code - Chapter 7, Drainage and Flood Control, Article I., In General, Section 7-2 Open-swale drainage systems; construction specifications and administrative procedures (b) Administrative Procedures; Permitting
Type: Ordinance Status: Enacted
File created: 4/5/2010 In control: Parish Council
On agenda: Final action: 4/19/2010
Enactment date: 4/19/2010 Enactment #: 10-4-14
Title: An ordinance to amend the Code of Ordinances Chapter 7, Drainage and Flood Control, Article I., In General, Section 7-2 Open-swale drainage systems; construction specifications and administrative procedures (b) Administrative Procedures; Permitting.
Sponsors: Paul J. Hogan, Carolyn K. Schexnaydre
Indexes: Culverts, Drg., Floods
Code sections: Ch. 7. Art. I. Sec. 7-2. - Open-swale drainage systems; construction specifications and administrative procedures
Attachments: 1. 2009-0424 4-27-09 PH memo to KM, 2. 2009-0424 5-4-09 KM memo to PH, 3. 2009-0424 7-21-09 PH memo to KM, 4. 2009-0424 8-19-09 2nd Requst memo to KM, 5. 2009-0424 9-14-09 3rd Request memo to KM, 6. 2009-0424 Failed Proposed Ordinance, 7. 2009-0424 12-8-09 PH memo KM, 8. 2009-0424 1-20-10 2nd Request memo to KM, 9. 2009-0424 Final Ord 10-4-14
Date Ver.Action ByActionResultAction DetailsMeeting DetailsVideo
4/20/20102 Parish President Approved by the Par. Pres.  Action details Meeting details Not available
4/19/20102 Parish Council Public Hearing Requirements Satisfied  Action details Meeting details Not available
4/19/20102 Parish Council ApprovedPass Action details Meeting details Not available
4/19/20102 Parish Council ReconsideredPass Action details Meeting details Not available
4/19/20102 Parish Council ApprovedPass Action details Meeting details Not available
4/5/20101 Council Member(s) Introduced  Action details Meeting details Not available
4/5/20102 Parish Council Publish/Scheduled for Public Hearing  Action details Meeting details Not available
12/8/20092 Council Member(s) Correspondence Sent  Action details Meeting details Not available
12/7/20091 Legislative Committee Discussed.  Action details Meeting details Not available
11/2/20091 Parish Council Tabled.Fail Action details Meeting details Not available
11/2/20091 Parish Council Public Hearing Requirements Satisfied  Action details Meeting details Not available
11/2/20091 Parish Council ApprovedFail Action details Meeting details Not available
10/19/20091 Council Member(s) Introduced  Action details Meeting details Not available
10/19/20091 Parish Council Publish/Scheduled for Public Hearing  Action details Meeting details Not available
7/21/20092 Council Member(s) Correspondence Sent  Action details Meeting details Not available
5/2/20092 Council Member(s) Correspondence Received  Action details Meeting details Not available
4/27/20092 Council Member(s) Correspondence Sent  Action details Meeting details Not available
2009-0424
INTRODUCED BY:      PAUL J. HOGAN, PE, COUNCILMAN, DISTRICT IV
                  CAROLYN K. SCHEXNAYDRE, COUNCILWOMAN-AT-LARGE, DIV. A
ORDINANCE NO.  ___________
Title
An ordinance to amend the Code of Ordinances Chapter 7, Drainage and Flood Control, Article I., In General, Section 7-2 Open-swale drainage systems; construction specifications and administrative procedures (b) Administrative Procedures; Permitting.
Body
THE ST. CHARLES PARISH COUNCIL HEREBY ORDAINS:
      SECTION I.      That the Code of Ordinances, Chapter 7, Drainage and Flood Control, Article I., In General, Section 7-2 Open-swale drainage systems; construction specifications and administrative procedures (b) Administrative Procedures; Permitting be amended as follows:
      AS WRITTEN:
(b)      Administrative Procedures; Permitting.
(1)      Application for related improvements or development must be submitted to the department of public works.  Applicants shall submit a non-refundable application fee of one hundred dollars ($100.00).  In addition, a swale deposit shall be submitted:  three hundred dollars ($300.00) for lots up to ninety (90) feet in width and four hundred dollars ($400.00) for lots over ninety (90) feet and up to two hundred (200) feet in width.  For lots over two hundred (200) feet in width, fees will be determined on a case-by-case basis.  The deposit for normal corner lots shall include an additional one hundred dollars ($100.00).
(2)      The swale deposit shall only be returned if the swale meets all of the above standards.  The applicant must submit a written request to the department of public works to inspect the swale.  The department shall arrange for the inspection of the swale by a licensed professional engineer registered in the State of Louisiana, either employed by the parish or contracted by the parish for the said purpose.  If the swale fails to pass inspection, the department of public works shall inform the applicant in writing of the deficiencies noted in the inspection.  If the deficiencies are not corrected within thirty (30) days of the date of the notice, then the department of public works may use all or a portion of the swale deposit to correct the deficiencies and to defray the cost of additional inspections; any remaining funds shall be returned to the applicant.
(3)      Upon final approval of the swale by the engineer, the department of public works shall furnish written certification of the completed swale to the department of planning and zoning.  No permanent electric meter shall be installed until the swale passes inspection.  Written notice by the planning department must be given to the electric utility company before the meter is installed at the site.
      REVISED:
(b)      Administrative Procedures; Inspection.
(1)      Upon request by the applicant for final inspection of permitted improvement on property which has open swale roadside drainage, the Planning and Zoning Department shall forward a written request to the Public Works Department requesting a formal inspection of the swale to confirm that no foreign material and/or debris exist within the original swale configuration.  The Public Works Department shall provide in writing a letter and/or e-mail to the Planning and Zoning Department stating that the swale is approved and that it is free of material and/or debris and is in its original configuration.  Upon receipt of the swale approval letter, the swale shall not be cause for denial of the installation of the permanent electric meter.  Should the swale be not approved, the Public Works Department report shall state the reason for disapproval and the remedial action needed for approval.  The applicant shall be provided a copy of the report and shall coordinate the remedial action to be performed by the applicant.  The applicant shall notify the Public Works Department in writing when the remedial work is complete and ready for re-inspection by the Public Works Department.  Should the swale fail the second inspection, the applicant shall be charged a swale re-inspection fee in the amount of one hundred dollars ($100.00) for each inspection thereafter which fee shall be paid prior to any subsequent inspection and prior to the installation of the permanent electric meter.  No permanent electric meter shall be installed until the swale approval letter is received by the Planning and Zoning Department from the Public Works Department.  Written notice by the Planning and Zoning Department must be provided to the electric utility company before the permanent meter is installed at the site.
Vote
      The foregoing ordinance having been submitted to a vote, the vote thereon was as follows:
 
 
 
 
      And the ordinance was declared adopted this _______ day of _____________, 2010, to become effective five (5) days after publication in the Official Journal.
Amend Code - Revised-Chapter 7, Section 7-2 Open Swale Drainage Systems Admin Procedures 2010.doc
 
 
CHAIRMAN: _________________________________
SECRETARY: _______________________________
DLVD/PARISH PRESIDENT: ____________________
APPROVED: ________ DISAPPROVED: __________
 
PARISH PRESIDENT: _________________________
RETD/SECRETARY: __________________________
AT: _______________ RECD BY: _______________