logo  ST. CHARLES PARISH, LA
File #: 2001-0413    Version: 1 Name: Amendment No. 7-Professional Services Agreement with Camp Dresser & McKee, Inc., Eastbank and Westbank Regional Wastewater Treatment Plants and associated Pumping Stations
Type: Ordinance Status: Enacted
File created: 11/5/2001 In control: Parish Council
On agenda: Final action: 12/3/2001
Enactment date: 12/3/2001 Enactment #: 01-12-7
Title: An ordinance to approve and authorize the execution of Amendment No. 7 to the Professional Services Agreement with Camp Dresser & McKee, Inc. for necessary Consulting Engineering Services associated with Parish Project No. S950301, Eastbank and Westbank Regional Wastewater Treatment Plants and associated Pumping Stations and Force Mains, to reconcile the final engineering cost, and to increase the contract by $57,833.00 primarily for the purpose of additional permit and rights of way acquisition work necessary to complete the project.
Sponsors: Albert D. Laque, Department of Wastewater
Indexes: SPW (EB and WB Regional Wastewater Treatment Plants and Associated Pumping Stations and Force Mains)
Attachments: 1. 2001-0413 Final Ord 01-12-7
Related files: 2000-0457, 2000-0594, 2001-0007, 2001-0438, 2002-0091, 2003-0003, 2006-0379, 2006-0286
2001-0413
INTRODUCED BY:      ALBERT D. LAQUE, PARISH PRESIDENT
                  (DEPARTMENT OF WASTEWATER)
ORDINANCE NO.                   
Title
An ordinance to approve and authorize the execution of Amendment No. 7 to the Professional Services Agreement with Camp Dresser & McKee, Inc. for necessary Consulting Engineering Services associated with Parish Project No. S950301, Eastbank and Westbank Regional Wastewater Treatment Plants and associated Pumping Stations and Force Mains, to reconcile the final engineering  cost, and to increase the contract by $57,833.00 primarily for the purpose of additional permit and rights of way acquisition work necessary to complete the project.
body
WHEREAS,      Ordinance No. 95-11-2, adopted November 6, 1995, authorized the execution of a Professional Services Agreement with Camp, Dresser, and McKee, Inc. (CDM) to perform necessary preconstruction, design, bidding, and construction management for the new Destrehan and Hahnville Wastewater Treatment Plants (WWTPs) for a fee of $1,908,289.00, and,
WHEREAS,      Ordinance No. 96-8-4, adopted August 5, 1996, added the Montz, Norco, Ama, Paradis, Killona, and Bayou Gauche Lift Stations and associated force mains to the original project scope and increased the total project engineering fees to $3,168,842.00, and,
WHEREAS,      Ordinance No. 97-3-2, adopted March 10, 1997, increased the time for resident inspection and construction management, increased the fees for surveying services and fees for the preparation of servitude/permit drawings, and increased the design fee to correspond to construction estimates, thus increasing the total project engineering fees to $4,613,223.00, and,
WHEREAS,      Ordinance No. 98-3-14, adopted March 24, 1998, clarified the design and resident inspection fees for the individual project components, and,
WHEREAS, Ordinance No. 00-10-8, adopted October 9, 2000, added of out-of-scope work to the original contract at the request of the Parish, the contingency fee was increased by $247,500.00, and,
WHEREAS, Ordinance No. 01-1-15, adopted January 9, 2001, extended the services date for resident engineering to 31 March 2001, and,
WHEREAS, Ordinance No. 01-1-16, adopted January 22, 2001, authorized continuance of resident engineering services through the completion of construction and thus increased the resident engineering upper limit to not exceed $1,108,186.00.
WHEREAS, the Project Budget is amended as follows:
            Peer Review                                           $        40,000.00
            Surveying Services                                          243,052.17
            Permits/Rights of Way Acquisition                        281,291.98
            Soils Testing                                          159,000.82
            Design Engineering                                       1,880,042.00
            Engineering Services During Construction                  805,733.00
            Resident Engineer (During Construction)               1,097,802.14
            Contingency                                          478,033.89
                  TOTAL PROJECT BUDGET                   $ 4,984,956.00  
THE ST. CHARLES PARISH COUNCIL HEREBY ORDAINS:
SECTION I.      That the Professional Services Agreement between CDM and the Parish of St. Charles is hereby amended and approved.
SECTION II.      That all other provisions of the Agreement, dated December 1, 1995 and as amended shall remain in full force and effect except as stated herein.
Vote
The foregoing Ordinance having been submitted to a vote, the vote thereon was as follows:
      And the Ordinance was declared adopted this ______ day of __________ 2001, to become effective five (5) days after this publication in the Official Journal.
 
 
CHAIRMAN:______________________________________________
SECRETARY:_____________________________________________
DLVD/PARISH PRESIDENT:_________________________________
APPROVED:______________ DISAPPROVED:__________________
 
 
PARISH PRESIDENT:______________________________________
RETD/SECRETARY:_______________________________________
AT:_______________RECD BY: _____________________________