logo  ST. CHARLES PARISH, LA
File #: 2009-0160    Version: Name: Engineering Services with Professional Engineering and Environmental Consultants, Inc (PEEC) for necessary Consulting Engineering Services associated with Parish Project No. P090403 Dianne Pump Station Bar Screen Cleaners
Type: Ordinance Status: Enacted
File created: 4/20/2009 In control: Parish Council
On agenda: Final action: 5/4/2009
Enactment date: 5/4/2009 Enactment #: 09-5-5
Title: An ordinance to approve and authorize the execution of a contract for Engineering Services with Professional Engineering and Environmental Consultants, Inc (PEEC) for necessary Consulting Engineering Services associated with Parish Project No. P090403 Dianne Pump Station Bar Screen Cleaners.
Sponsors: V.J. St. Pierre Jr., Department of Public Works
Indexes: DRO (Dianne Pump Station Bar Screen Cleaners)
Attachments: 1. Dianne Pump Station Engr contract.pdf, 2. 2009-0160 Contract-F, 3. 2009-0160 Final Ord 09-5-5 with Contract
Related files: 2011-0054, 2011-0339

2009-0160

INTRODUCED BY:                     V.J. ST. PIERRE, JR., PARISH PRESIDENT

                                                               (DEPARTMENT OF PUBLIC WORKS)

ORDINANCE NO.                     ____________

Title

An ordinance to approve and authorize the execution of a contract for Engineering Services with Professional Engineering and Environmental Consultants, Inc (PEEC) for necessary Consulting Engineering Services associated with Parish Project No. P090403 Dianne Pump Station Bar Screen Cleaners.

Body

WHEREAS,                     during storm events, debris accumulation on the bar screen of the Dianne Pump Station during storm events prevents the station from operating at optimal efficiency; and,

WHEREAS,                     the addition of bar screen cleaners and the replacement of the bar screen would restore the flow of stormwater into the pump station by removing the debris; and,

WHEREAS,                     the St. Charles Parish desires to have the following described projects undertaken:

PROJECT DESCRIPTION:

Engineering Services for Parish Project No. P090403 Dianne Pump Station Bar Screen Cleaners. The service will include but will not be limited to serving as Owner's professional engineering representative for the Project, providing professional engineering consultation and advice, and furnishing customary civil, geotechnical, structural, mechanical, electrical, instrumentation and control engineering services and construction engineering and inspection; and,

WHEREAS,                     the opinion of probable project budget is as follows:

                     Engineering Services                                                                                    $   287,400

                     Construction                                                                                                                              $1,500,000

                     Other Project Cost                                                                                                         $     45,600

                                          Advertising, Recordation, etc.                                              

                                          Land Acquisition, Right-of-Ways                                              

                                          Permits, Surveying                                                                                        

                                          Soil Testing, Project Inspection                                              

                                                               TOTAL PROJECT BUDGET                     $1,833,000

THE ST. CHARLES PARISH COUNCIL HEREBY ORDAINS:

                     SECTION I.                     That the attached contract for Engineering Services between Professional Engineering and Environmental Consultants, Inc (PEEC) and the Parish of St. Charles is hereby approved.

                     SECTION II.                     That the Parish President is hereby authorized to execute the attached agreement on behalf of the Parish of St. Charles.

                     SECTION III.                     

A. That $50,000 of the total project budget be allocated to the above described project and appropriated from the Roads (112) Fund.

B. That $1,783,000 in Project funding is contingent upon receiving a FEMA Grant.

Vote

                     The foregoing ordinance having been submitted to a vote, the vote thereon was as follows:

 

 

 

 

                     And the ordinance was declared adopted this ______ day of _____________, 2009, to become effective five (5) days after publication in the Official Journal.

 

 

CHAIRMAN:_____________________________________________

SECRETARY:____________________________________________

DLVD/PARISH PRESIDENT:_________________________________

APPROVED:______________ DISAPPROVED:__________________

 

PARISH PRESIDENT:______________________________________

RETD/SECRETARY:_______________________________________

AT:_______________ RECD BY: _____________________________