logo  ST. CHARLES PARISH, LA
File #: 2004-0470    Version: Name: Cooperative Endeavor Agreement-Pontchartrain Levee District for SCP Urban Flood Control Feasibility Study
Type: Ordinance Status: Enacted
File created: 12/6/2004 In control: Parish Council
On agenda: Final action: 12/20/2004
Enactment date: 12/20/2004 Enactment #: 04-12-12
Title: An ordinance to approve and authorize the execution of a Cooperative Endeavor Agreement with the Pontchartrain Levee District for the St. Charles Parish Urban Flood Control Feasibility Study, Project No. P021103.
Sponsors: Clayton 'Snookie' Faucheux, Albert D. Laque
Indexes: Floods, Pontchartrain Levee District
Attachments: 1. 2004-0470 Agreement-F, 2. 2004-0470 Final Ord 04-12-12 with Agreement
2004-0470
INTRODUCED BY:      CLAYTON FAUCHEUX, COUNCILMAN-AT-LARGE, DIVISION B
                  ALBERT D. LAQUE, PARISH PRESIDENT
ORDINANCE NO.                   
Title
An ordinance to approve and authorize the execution of a Cooperative Endeavor Agreement with the Pontchartrain Levee District for the St. Charles Parish Urban Flood Control Feasibility Study, Project No. P021103.
Body
WHEREAS,      The Pontchartrain Levee District is the local sponsor for the Lake Pontchartrain and Vicinity Hurricane Protection Project in St. Charles Parish; and,
WHEREAS,      the current project does not include the installation of pump stations along the levee system to remove rain water during times when the flow through structures are required to be closed; and,
WHEREAS,      the U. S. Army Corps of Engineers, the Pontchartrain Levee District, and St. Charles Parish realize the importance of the pumping stations to protect and preserve the health, safety, welfare, and well being of the residents of the East Bank of St. Charles Parish from flooding; and,
WHEREAS,      the U. S. Army Corps of Engineers is prepared to proceed with the St. Charles Parish Urban Flood Control Feasibility Study, Project No. P021103 provided the local sponsor agrees to the fifty (50%) percent local match; and,
WHEREAS,      the Pontchartrain Levee District has agreed to be the local sponsor provided the Parish shares the local non-Federal cost portion of the project; and,
WHEREAS,      the local sponsor portion of the project will be funded 80% by the Pontchartrain Levee District and 20% by the Parish.
THE ST. CHARLES PARISH COUNCIL HEREBY ORDAINS:
SECTION I.      That the St. Charles Parish Urban Flood Control Feasibility Study Cooperative Endeavor Agreement between The Pontchartrain Levee District and St. Charles Parish is hereby approved.
SECTION II.      That the Parish President is hereby authorized to execute said Agreement on behalf of St. Charles Parish.
Vote
The foregoing ordinance having been submitted to a vote, the vote thereon was as follows:
 
 
 
 
And the ordinance was declared adopted this            day of                       , 2004, to become effective five (5) days after publication in the Official Journal.
Urban Flood Control Feasibility Study
 
 
 
CHAIRMAN:                                     
SECRETARY:                                     
DLVD/PARISH PRESIDENT:                         
APPROVED:                         DISAPPROVED:             
 
PARISH PRESIDENT:                               
RETD/SECRETARY:                               
AT:                              RECD BY: