Title: An ordinance to approve and authorize the execution of a Construction Contract with ARC Mechanical Contractors, Inc. for Project No. P101001-2, Courthouse HVAC Efficiency Improvements Project in the amount of $537,000.00.
Sponsors: V.J. St. Pierre Jr., Department of Public Works
Indexes: Courthouse, Jail and Facilities (Retrofit Proj.)
Attachments: 1. Bid Tab.xls, 2. HVAC Agreement.pdf, 3. 2011-0311 Contract-F, 4. 2011-0311 Final Ord 11-10-2 with Contract
Related files: 2020-0050, 2019-0051, 2012-0166, 2016-0339, 2018-0227, 2018-0263, 2010-0385, 2017-0202, 2018-0064, 2019-0100, 2019-0318, 2019-0331, 2020-0205, 2021-0138, 2024-0066
2011-0311
INTRODUCED BY:      V.J. ST. PIERRE, JR., PARISH PRESIDENT
                  (DEPARTMENT OF PUBLIC WORKS)
ORDINANCE NO.                   
Title
An ordinance to approve and authorize the execution of a Construction Contract with ARC Mechanical Contractors, Inc. for Project No. P101001-2, Courthouse HVAC Efficiency Improvements Project in the amount of $537,000.00.
Body
WHEREAS,      sealed bids were received by St. Charles Parish on September 15, 2011 for Project No. P101001-2, Courthouse HVAC Efficiency Improvements Project; and,
WHEREAS,      Schantz Engineering, LLC, Isaac Schantz P.E., the Engineer for the Project, has reviewed the bids and recommended that the Contract be awarded to the low bidder, ARC Mechanical Contractors, Inc. in the amount of $537,000.00; and,
WHEREAS,      the capacity of the existing St. Charles Parish Courthouse HVAC System is marginal for the Courthouse Building requirements for the cooling/heating demands throughout the year; and the existing cooling tower is at an eminent point of failure which would terminate the capacity to cool the Courthouse Building with the existing HVAC System; and the location of the current cooling tower is in a roof well which limits the cooling capacity of the cooling tower; and,
WHEREAS,      an Energy Recovery Unit will be installed to pre-condition the outside   make-up air in the St. Charles Parish Courthouse HVAC System to improve the efficiency, and enable the system to react faster to changes in cooling/heating demands for the building; and to replace/relocate the cooling tower for the HVAC System to maintain the ability to cool the Courthouse Building in a more efficient manner; and the HVAC System efficiency improvements will reduce the operating expenses of the Courthouse HVAC System; and,
WHEREAS, the construction costs for this project will be funded by the American Recovery and Reinvestment Act through the U.S. Department of Energy through the Louisiana Department of Natural Resources under the Renew Louisiana Energy Efficiency and Conservation Block Grant (DNR Memorandum of Agreement (MOA)/Award # EEA-1042) awarded to the Parish in the amount of $353,000.
THE ST. CHARLES PARISH COUNCIL HEREBY ORDAINS:
SECTION I.      That the bid of ARC Mechanical Contractors, Inc. for the installation of the Energy Recovery Unit and Replacement of Cooling Towers for the Courthouse HVAC System under Project No. P101001-2, Courthouse HVAC Efficiency Improvements Project, be hereby accepted, in the amount of $537,000.00.
SECTION II.      That the Parish President is hereby authorized to execute said contract on behalf of the St. Charles Parish.
Vote
The foregoing ordinance having been submitted to a vote, the vote thereon was as follows:
 
 
 
 
      And the ordinance was declared adopted this ______ day of ___________, 2011 to become effective five (5) days after publication in the Official Journal.
 
 
 
CHAIRMAN: ____________________________________________
SECRETARY: ___________________________________________
DLVD/PARISH PRESIDENT: ________________________________
APPROVED:______________ DISAPPROVED:__________________
 
PARISH PRESIDENT:______________________________________
RETD/SECRETARY:_______________________________________
AT:_______________ RECD BY: ______________________________