Title: An ordinance to approve and authorize the execution of a Contract for Engineering Services with Principal Engineering, Inc. for necessary professional engineering services associated with Parish Project No. P090301 Fairfield & Oakland Pump Stations Upgrade project.
Sponsors: V.J. St. Pierre Jr., Department of Public Works
Indexes: DRO (Fairfield and Oakland Pump Stations Upgrade)
Attachments: 1. 2009-0133 Contract-F, 2. 2009-0133 Final Ord 09-4-17 with Contract
Related files: 2011-0232, 2018-0191, 2015-0145, 2011-0224, 2011-0114, 2014-0319, 2022-0083
2009-0133
INTRODUCED BY:      V.J. ST. PIERRE, JR., PARISH PRESIDENT
                  (DEPARTMENT OF PUBLIC WORKS)
ORDINANCE NO.                          
Title
An ordinance to approve and authorize the execution of a Contract for Engineering Services with Principal Engineering, Inc. for necessary professional engineering services associated with Parish Project No. P090301 Fairfield & Oakland Pump Stations Upgrade project.
Body
WHEREAS,      the St. Charles Parish Council desires to have the following described projects undertaken:
PROJECT DESCRIPTION:
Engineering Services for Parish Project No. P090301 Fairfield & Oakland Pump Stations Upgrade project. The service will include but will not be limited to serving as Owner's professional engineering representative for the Project, providing professional engineering consultation and advice, and furnishing customary civil, geotechnical, structural, mechanical, electrical, instrumentation and control engineering services and construction engineering and inspection; and,
WHEREAS,      because of the complexity of the project, it will be implemented in phases so as to better control project timing and cost; and,
WHEREAS,      the opinion of probable project budget is as follows:
      Engineering Services                        $           50,000.00
      Construction                                        ______________
      Other Project Cost                                  ______________
            Advertising, Recordation, etc.                 
            Land Acquisition, Right-of-Ways                 
            Permits, Surveying                             
            Soil Testing, Project Inspection                 
                  TOTAL PROJECT BUDGET      $           50,000.00
THE ST. CHARLES PARISH COUNCIL HEREBY ORDAINS:
      SECTION I.      That the contract for Engineering Services between Principal Engineering, Inc. and the Parish of St. Charles is hereby approved.
      SECTION II.      That the Parish President is hereby authorized to execute said contract on behalf of the Parish of St. Charles.
SECTION III.      That the necessary funds for the total project budget in the amount $ 50,000.00 be allocated to the above described project and appropriated from the Roads and Drainage (112) Fund.
Vote
The foregoing ordinance having been submitted to a vote, the vote thereon was as follows:
 
 
 
 
      And the ordinance was declared adopted this ______ day of ___________, 2009 to become effective five (5) days after publication in the Official Journal.
 
 
 
CHAIRMAN:____________________________________________
SECRETARY:___________________________________________
DLVD/PARISH PRESIDENT:________________________________
APPROVED:______________ DISAPPROVED:_________________
 
PARISH PRESIDENT:_____________________________________
RETD/SECRETARY:______________________________________
AT:_______________ RECD BY: _____________________________