logo  ST. CHARLES PARISH, LA
File #: 2003-0127    Version: 1 Name: Engineering Services Contract with Evans-Graves Engineers, Inc.-Murray Hill Subsurface Drainage
Type: Ordinance Status: Enacted
File created: 4/7/2003 In control: Parish Council
On agenda: Final action: 4/21/2003
Enactment date: 4/21/2003 Enactment #: 03-4-22
Title: An ordinance to approve and authorize the execution of an Engineering Services Contract with Evans-Graves Engineers, Inc. for the design of Parish Project No. P011005, Murray Hill Subsurface Drainage.
Sponsors: Albert D. Laque, Department of Public Works
Indexes: DRO (Murray Hill Subsurface Drg.)
Attachments: 1. 2003-0127 Contract-F, 2. 2003-0127 Final Ord 03-4-22 with Contract
Related files: 2005-0161, 2004-0095
2003-0127
INTRODUCED BY:      ALBERT D. LAQUE, PARISH PRESIDENT
                  (DEPARTMENT OF PUBLIC WORKS)
ORDINANCE NO.__________
Title
An ordinance to approve and authorize the execution of an Engineering Services Contract with Evans-Graves Engineers, Inc. for the design of Parish Project No. P011005, Murray Hill Subsurface Drainage.
Body
WHEREAS,      subsurface drainage is required in the area between Destrehan and Murray Hill Drives in order to improve drainage during storms; and,
WHEREAS,      this project design will implement a subsurface drainage system in the aforementioned area from the RR tracks to LA 48; and,
WHEREAS,      the QBS Selection Board met on February 26, 2003 and recommended award of Parish Project No. P011005, Murray Hill Subsurface Drainage to Evans-Graves Engineers, Inc. (See Attachment A); and,
WHEREAS,      the Probable Project Budget for this contract is as follows:
      Construction                        $      502,500
      Basic Engineering                                 35,500
      Soils Investigation                                5,500
      Surveying                                10,500
      Resident Inspection                       61,000
      Testing/Other                             21,000
      Total Probable Project Budget      $      636,000
THE ST. CHARLES PARISH COUNCIL HEREBY ORDAINS:
      SECTION I.      That the Engineering Services Contract with Evans-Graves Engineers, Inc. for the design of Parish Project No. P011005, Murray Hill Subsurface Drainage be hereby accepted.
      SECTION II.      That the Parish President is hereby authorized to execute the attached Engineering Services Contract.
Vote
      The foregoing ordinance having been submitted to a vote, the vote thereon was as follows:
 
 
 
 
      And the ordinance was declared adopted this ______ day of ____________, 2003, to become effective five (5) days after publication in the Official Journal.
 
 
CHAIRMAN:______________________________________________
SECRETARY:_____________________________________________
DLVD/PARISH PRESIDENT:_________________________________
APPROVED:______________ DISAPPROVED:__________________
 
PARISH PRESIDENT:______________________________________
RETD/SECRETARY:_______________________________________
AT:_______________ RECD BY: _____________________________