logo  ST. CHARLES PARISH, LA
File #: 2008-0083    Version: 1 Name: PP urgently take the necessary steps needed to permit, design, and construct the Bayou Des Allemands Floodwall - Phase I located between the Sunset Drainage District Levee and the Southern Pacific Railroad in Des Allemands
Type: Resolution Status: Approved
File created: 2/11/2008 In control: Parish Council
On agenda: Final action: 2/11/2008
Enactment date: 2/11/2008 Enactment #: 5506
Title: A resolution requesting the Parish President to urgently take the necessary steps needed to permit, design, and construct the Bayou Des Allemands Floodwall - Phase I located between the Sunset Drainage District Levee and the Southern Pacific Railroad in Des Allemands, St. Charles Parish, Louisiana.
Sponsors: Paul J. Hogan, Carolyn K. Schexnaydre, Terry Authement
Indexes: DRO (Des Allemands Flood Wall Levee)
Attachments: 1. 2008-0083 PH memo PC, PP, 2. 2008-0083 Shread ltr to PW, 3. 2008-0083 Final Reso 5506
2008-0083
INTRODUCED BY:      PAUL J. HOGAN, COUNCILMAN, DISTRICT IV
                  CAROLYN K. SCHEXNAYDRE, COUNCILWOMAN-AT-LARGE, DIVISION A
                  TERRY AUTHEMENT, COUNCILMAN-AT-LARGE, DIVISION B
RESOLUTION NO.  __________
Title
A resolution requesting the Parish President to urgently take the necessary steps needed to permit, design, and construct the Bayou Des Allemands Floodwall - Phase I located between the Sunset Drainage District Levee and the Southern Pacific Railroad in Des Allemands, St. Charles Parish, Louisiana.
Body
WHEREAS,      this area along Bayou Des Allemands is not part of the Sunset Drainage District and is the responsibility of St. Charles Parish; and,
WHEREAS,      this unprotected area along Bayou Des Allemands puts the Sunset Drainage District residents and businesses and those in Des Allemands located south of the Southern Pacific Railroad which are not in the Sunset Drainage District, at a severe risk of flooding during minor tropical storm events; and,
WHEREAS,      over 1,400 residents of the Sunset Drainage District signed a petition in 2005 asking St. Charles Parish to provide the necessary funding to establish an adequate level of flood protection to the District; and,
WHEREAS,      the Parish currently has the necessary funds in the General Fund or can transfer funds out of the Capital Outlay portion of the Roads and Drainage Fund to design and build the project; and,
WHEREAS,      the construction of this floodwall would immediately provide protection to the communities of Des Allemands, Paradis, and the Bayou Gauche area during storm events that would flood most of the West Bank; and,
WHEREAS,      this floodwall is part of the West Bank Hurricane Protection Plan and is needed to ultimately protect most residents on the West Bank of St. Charles Parish.
NOW THEREFORE, BE IT RESOLVED, THAT WE, THE MEMBERS OF THE ST. CHARLES PARISH COUNCIL, do hereby request the Parish President to urgently take the necessary steps needed to permit, design, and construct the Bayou Des Allemands Floodwall - Phase I located between the Sunset Drainage District Levee and the Southern Pacific Railroad in Des Allemands, St. Charles Parish, Louisiana.
BE IT FURTHER RESOLVED that the construction be that of a tar-coated steel sheetpile floodwall with a small reinforced concrete cap located at the top of the floodwall.
BE IT FURTHER RESOLVED that a flood-proof opening be provided in the floodwall on the property of each property owner so as to provide continued access to the bayou.
BE IT FURTHER RESOLVED that the permit applications provide for the allowance for the future capping of the entire exposed floodwall with a concrete cap at a later date should it be desired.
BE IT FURTHER RESOLVED that the Sunset Drainage District and the Bayou Gauche Citizens Action Committee be provided a copy of this resolution.
Vote
The foregoing resolution having been submitted to a vote, the vote thereon was as follows:
 
 
 
 
And the resolution was declared adopted this            day of                     , 2008, to become effective five (5) days after publication in the Official Journal.
RESOL - DA FLOODWALL - PHASE I
 
 
CHAIRMAN:______________________________________________
SECRETARY:_____________________________________________
DLVD/PARISH PRESIDENT:_________________________________
APPROVED:______________ DISAPPROVED:__________________
 
PARISH PRESIDENT:______________________________________
RETD/SECRETARY:_______________________________________
AT:_______________ RECD BY: _____________________________