File #: 2016-0298    Version: 1 Name: Change Order No. 1 for the Willowridge Pump Station, Willowridge Levee - Phase II, as part of the West Bank Hurricane Protection Levee Project
Type: Ordinance Status: Enacted
File created: 8/15/2016 In control: Parish Council
On agenda: 9/6/2016 Final action: 9/6/2016
Enactment date: Enactment #: 16-9-2
Title: An ordinance approving and authorizing the execution of Change Order No. 1 for the Willowridge Pump Station Project No. P080905-4A, Willowridge Levee - Phase II, State Project No.H.010102, as part of the West Bank Hurricane Protection Levee Project, to increase the contract amount by $60,059.00 and increase the contract time by forty three (43) days.
Sponsors: Lawrence 'Larry' Cochran, Department of Public Works
Indexes: Floods, Highway Dept., Hurricane Protection Levee (WB - Willowridge, Ph. II)
Attachments: 1. 2016-0298 Change Order 1 Willowridge PS, 2. 2016-0298 Work Change Directive 1 - Signed by All, 3. 2016-0298 Work Change Directive No. 2 Executed, 4. 2016-0298 WC 3 Signed, 5. 2016-0298 P080905-4A Work Change Directive 4, 6. 2016-0298 P080905-4A Work Change Directive 5, 7. 2016-0298 Change Order-F, 8. 2016-0298 Final Ord 16-9-2 with Change Order
Related files: 2011-0307, 2012-0084, 2012-0294, 2015-0116, 2015-0233, 2015-0234, 2015-0253, 2016-0387, 2017-0350, 2017-0411, 2018-0159
2016-0298
INTRODUCED BY: LARRY COCHRAN, PARISH PRESIDENT
(DEPARTMENT OF PUBLIC WORKS)
ORDINANCE NO. _____
Title
An ordinance approving and authorizing the execution of Change Order No. 1 for the Willowridge Pump Station Project No. P080905-4A, Willowridge Levee - Phase II, State Project No.H.010102, as part of the West Bank Hurricane Protection Levee Project, to increase the contract amount by $60,059.00 and increase the contract time by forty three (43) days.
Body
WHEREAS, Ordinance No. 15-8-5, adopted August 3, 2015, by the St. Charles Parish Council, approved and authorized the execution of a contract with Sealevel Construction Inc. for the Willowridge Pump Station Project No. P080905-4A, Willowridge Levee - Phase II, State Project No.H.010102, in the amount of $60,059.00; and,
WHEREAS, Change Order No. 1 is a result of a change within the scope of the contract to install a 2" water meter to provide potable water to the Pump Station; increase the capacity of electrical system for equipment power requirements to serve the Pump Station; increase the size of the fenced area securing the Pump Station for access to Pump Station equipment; and,
WHEREAS, the increase in the contract amount of $60,059.00 is a result of the addition of one (1) bid line item and increase in six (6) bid line items; and,
WHEREAS, the increase in contract time by forty three (43) days is a result of additional days projected to construct the Willowridge Pump Station.
THE ST. CHARLES PARISH COUNCIL HEREBY ORDAINS,
SECTION I. That Change Order No. 1 for the Willowridge Pump Station Project No. P080905-4A, Willowridge Levee - Phase II, State Project No.H.010102, as part of the West Bank Hurricane Protection Levee Project, to increase the contract amount by $60,059.00 and increase the contract time by forty three (43) days is hereby approved and accepted.
SECTION II. That the Parish President is hereby authorized to execute said Change Order No. 1 on behalf of St. Charles Par...