logo  ST. CHARLES PARISH, LA
File #: 2008-0422    Version: 1 Name: Contract for Engineering Services with ENVIRONMENTAL ENGINEERING SERVICES(EES), INC. for necessary professional engineering services associated with Parish Project No. S080503 High Priority Sewer Lift Station Upgrades
Type: Ordinance Status: Enacted
File created: 10/6/2008 In control: Parish Council
On agenda: Final action: 10/20/2008
Enactment date: 10/20/2008 Enactment #: 08-10-10 AMENDED
Title: An ordinance to approve and authorize the execution of a Contract for Engineering Services with ENVIRONMENTAL ENGINEERING SERVICES (EES), INC. for necessary professional engineering services associated with Parish Project No. S080503 High Priority Sewer Lift Station Upgrades.
Sponsors: V.J. St. Pierre Jr., Department of Public Works
Indexes: SPW (High Priority Sewer Lift Station Upgrades)
Attachments: 1. 2008-0422 Contract-F, 2. 2008-0422 Final Ord 08-10-10 with Contract
Related files: 2012-0212, 2012-0198, 2009-0422, 2010-0446, 2016-0281, 2017-0308, 2018-0210
2008-0422
INTRODUCED BY: V.J. ST. PIERRE, JR., PARISH PRESIDENT
(DEPARTMENT OF PUBLIC WORKS)
ORDINANCE NO.
Title
An ordinance to approve and authorize the execution of a Contract for Engineering Services with ENVIRONMENTAL ENGINEERING SERVICES (EES), INC. for necessary professional engineering services associated with Parish Project No. S080503 High Priority Sewer Lift Station Upgrades.
Body
WHEREAS, the St. Charles Parish Council desires to have the following described project undertaken:
PROJECT DESCRIPTION:
Engineering services for Parish Project No. S080503 High Priority Sewer Lift Station Upgrades. The service will include but will not be limited to serving as Owner's professional engineering representative for the Project, providing professional engineering consultation and advice, and furnishing customary civil geotechnical, structural, mechanical, electrical, instrumentation and control engineering services and construction engineering and inspection; and,
WHEREAS, Residential growth on the west bank has increased flows to a majority of the sewerage lift stations to a point of reaching their maximum capacity. These eight stations have been determined to be high priority, and require upgrades such as larger pumps, new transmission lines, and back up pumps. Upgrading these stations will also prevent overflow events at peak flows; and,
WHEREAS, because of the complexity of the project, it will be implemented in the following phases so as to better control project timing and cost:
· Magnolia Ridge lift station
· Ama lift station
· St. John St. lift Station
· Holder lift station and transmission line
· Bosco lift station and transmission line
· Marino lift station
· Hwy 306 lift stations. Matherne & Canal LS and
transmission line, and Pine St. lift station
THE ST. CHARLES PARISH COUNCIL HEREBY ORDAINS:
SECTION I. That the contract for Engineering Services between ENVIRONMENTAL ENGINEERING SERICES (EES), INC. and theParish of...