Title: An ordinance to approve and authorize the execution of an Engineering Services Contract with N-Y Associates, Inc. the design of Parish Project No. P030614, Willowdale Box Culvert Enhancement.
Sponsors: Albert D. Laque, Department of Public Works
Indexes: DRO (Willowdale Box Culvert Enhancement)
Attachments: 1. 2004-0122 Contract-F, 2. 2004-0122 Final Ord 04-4-7 with Contract
2004-0122
INTRODUCED BY: ALBERT D. LAQUE, PARISH PRESIDENT
(DEPARTMENT OF PUBLIC WORKS)
ORDINANCE NO.__________
Title
An ordinance to approve and authorize the execution of an Engineering Services Contract with N-Y Associates, Inc. the design of Parish Project No. P030614, Willowdale Box Culvert Enhancement.
Body
WHEREAS, the existing canal improvements are required along the pump station canal beginning approximately 800 feet west of the box culvert underneath Willowdale Blvd extending to the box culvert near Willowdale Country Club; and,
WHEREAS, this project design will implement the necessary improvements along the pump station canal to stabilize the existing canal banks and to provide erosion control during severe rainfall events; and,
WHEREAS, the QBS Selection Board met on March 3, 2004 and recommended award of Parish Project No. P030614, Willowdale Box Culvert Enhancement to N-Y Associates, Inc. (See Attachment A); and,
WHEREAS, the Probable Project Budget for this contract is as follows:
Construction $ 320,000
Basic Engineering 24,250
Soils Investigation 3,500
Surveying 7,100
Resident Inspection 38,200
Testing/Other 12,800
Total Probable Project Budget $ 405,850
THE ST. CHARLES PARISH COUNCIL HEREBY ORDAINS:
SECTION I. That the Engineering Services Contract with N-Y Associates, Inc. for the design of Parish Project No. P030614, Willowdale Box Culvert Enhancement be hereby accepted.
SECTION II. That the Parish President is hereby authorized to execute the attached Engineering Services Contract.
Vote
The foregoing ordinance having been submitted to a vote, the vote thereon was as follows:




And the ordinance was declared adopted this ______ day of ____________, 2004, to become effective five (5) days after publication in the Official Journal.


CHAIRMAN:______________________________________________
SECRETARY:________________________________________...

Click here for full text