File #: 2010-0097    Version: 1 Name: Contract for Engineering Services-EVANS-GRAVES ENGINEERS, INC. for professional engineering services associated with Parish Project No. P100301 Install Control Gates on Culverts at Prescott Pump Station and Temporary Pumps at Walker and Almedia Tidal
Type: Ordinance Status: Enacted
File created: 3/1/2010 In control: Parish Council
On agenda: Final action: 3/22/2010
Enactment date: 3/22/2010 Enactment #: 10-3-5
Title: An ordinance to approve and authorize the execution of a Contract for Engineering Services with EVANS-GRAVES ENGINEERS, INC. for necessary professional engineering services associated with Parish Project No. P100301 Install Control Gates on Culverts at Prescott Pump Station and Temporary Pumps at Walker and Almedia Tidal Control Structures.
Sponsors: V.J. St. Pierre Jr., Department of Public Works
Indexes: DRO (Prescott Pump Station and Walker and Almedia Structures)
Attachments: 1. 2010-0097 Contract-F, 2. 2010-0097 Final Ord 10-3-5 with Contract
Related files: 2010-0415, 2011-0143
2010-0097
INTRODUCED BY: V.J. ST. PIERRE, JR., PARISH PRESIDENT
(DEPARTMENT OF PUBLIC WORKS)
ORDINANCE NO.
Title
An ordinance to approve and authorize the execution of a Contract for Engineering Services with EVANS-GRAVES ENGINEERS, INC. for necessary professional engineering services associated with Parish Project No. P100301 Install Control Gates on Culverts at Prescott Pump Station and Temporary Pumps at Walker and Almedia Tidal Control Structures.
Body
WHEREAS, the St. Charles Parish Council desires to have the following described project undertaken:
PROJECT DESCRIPTION:
Engineering services for Parish Project No. P100301 Install Control Gates on Culverts at Prescott Pump Station and Temporary Pumps at Walker and Almedia Tidal Control Structures. The service will include but will not be limited to serving as Owner's professional engineering representative for the Project, providing professional engineering consultation and advice, and furnishing customary civil, geotechnical, structural, mechanical, electrical, instrumentation and control engineering services and construction engineering and inspection; and,
WHEREAS, this project will improve flood control in two areas of the East Bank of the parish, tidal flow under Highway 61 near the Prescott Pump Station and at the Walker and Almedia tidal gates on the East Bank Levee.
THE ST. CHARLES PARISH COUNCIL HEREBY ORDAINS:
SECTION I. That the contract for Engineering Services between EVANS-GRAVES ENGINEERS, INC. and the Parish of St. Charles is hereby approved.
SECTION II. That the Parish President is hereby authorized to execute said contract on behalf of the Parish of St. Charles.
Vote
The foregoing ordinance having been submitted to a vote, the vote thereon was as follows:




And the ordinance was declared adopted this ______ day of ___________, 2010 to become effective five (5) days after publication in the Official Journal.