2020-0317
INTRODUCED BY:	MATTHEW JEWELL, PARISH PRESIDENT
			(DEPARTMENT OF PUBLIC WORKS AND WASTEWATER)
ORDINANCE NO. ___________
Title
An ordinance to amend the St. Charles Parish Code of Ordinances, Chapter 25 - Stormwater Management and Erosion and Sedimentation Control, Article IV, Section 25-52. - Post construction stormwater standards and requirements, paragraph (b)(2) to provide downstream overbank flood and property protection for a 25-year, 24-hour storm event. 
Body
WHEREAS,	Chapter 25 currently requires downstream overbank flood and property protection to be provided by requiring development sites to control the post-development peak discharge rate to the pre-development rate for a 10-year, 24-hour storm event; and,
WHEREAS,	the St. Charles Parish Council wishes to increase this to post-development peak discharge rate to the pre-development rate for a 25-year, 24-hour storm event.
NOW, THEREFORE, THE ST PARISH COUNCIL ORDAINS:
      SECTION I.	That the Code of Ordinances, Chapter 25 - Stormwater Management and Erosion and Sedimentation Control, Article IV, Section 25-52. - Post construction stormwater standards and requirements, paragraph (b)(2), is amended as follows, with additional text in underline and deleted text in strikethrough: 
Sec. 25-52. - Post construction stormwater standards and requirements.
(b)	Post-development stormwater management performance criteria. 
(2)	Overbank flooding protection of bayous and waterways.  Downstream overbank flood and property protection shall be provided by controlling the post-development peak discharge rate to the pre-development rate for the ten25-year, twenty-four24-hour return frequency storm event.
      The foregoing ordinance having been submitted to a vote, the vote thereon was as follows: 
	And the ordinance was declared adopted this _______ day of __________, 2020 to become effective five (5) days after publication in the Official Journal.
CHAIRMAN: 						
SECRETARY: 						
DLVD/PARISH PRESI...
Click here for full text