An ordinance approving and authorizing the execution of a Professional Service Agreement with Waggoner Engineering, Inc. to perform engineering services for the East Bank A and B Plant Demolition (Project No. WWKS 116), in the lump sum amount of $213,023.00.
Body
WHEREAS, St. Charles Parish desires to demolish infrastructure associated with East Bank A & B plants; and,
WHEREAS, the projected work includes, but not limited to: demolish, excavate, haul and dispose of an existing 50-ft diameter x 10-ft deep concrete storage tank; demolish, excavate, haul and dispose of the existing approx. 6,000 SF (footprint) structures of treatment trains A & B; demolish, excavate, haul and dispose of the existing concrete tank and treatment trains A & B concrete foundations, including plotting existing piles; Abandon in place and reroute subsurface pipelines at various locations as a result of the proposed demolition work and backfill, grade and hydroseed all excavated/disturbed areas; and,
WHEREAS, St. Charles Parish wishes to contract with Waggoner Engineering, Inc., to perform the Plan Development, Bidding and Advertising, and Construction for the East Bank A and B Plant Demolition (Project No. WWKS 116), as described in Attachments A, B, and C.
THE ST. CHARLES PARISH COUNCIL HEREBY ORDAINS:
SECTION I. That the Professional Services Agreement between St. Charles Parish and Waggoner Engineering, Inc. the East Bank A and B Plant Demolition (Project No. WWKS 116), in the lump sum amount of $213,023.00 is hereby approved and accepted.
SECTION II. That the Parish President is hereby authorized to execute said Agreement on behalf of St. Charles Parish.