logo  ST. CHARLES PARISH, LA
File #: 2017-0215    Version: 1 Name: Professional service multi-phase project engineering contract with Evans-Graves Engineers, Inc. for Project Number P140201; Paul Maillard Rd (LA 52) Corridor Revitalization Plan
Type: Ordinance Status: Enacted
File created: 7/10/2017 In control: Parish Council
On agenda: 7/31/2017 Final action: 7/31/2017
Enactment date: Enactment #: 17-7-9
Title: An ordinance to approve and authorize the execution of a professional service multi-phase project engineering contract with EVANS-GRAVES ENGINEERS, INC., for providing all necessary professional, engineering services to design and oversee the construction of the transportation redevelopment phase & drainage portion of the infrastructure & public spaces redevelopment phase of Parish Project Number P140201; Titled PAUL MAILLARD RD (LA 52) CORRIDOR REVITALIZATION PLAN.
Sponsors: Lawrence 'Larry' Cochran, Department of Public Works
Indexes: Highway Dept. (Paul Maillard Road Revitalization), Public Works (Dept. of)
Attachments: 1. 2017-0215 Multi Phase Contract, 2. 2017-0215 Contract-F, 3. 2017-0215 Final Ord 17-7-9 with Contract
Related files: 2016-0203, 2013-0008, 2012-0265, 2014-0355, 2012-0069, 2011-0212, 2013-0007, 2018-0032, 2019-0079, 2019-0188, 2024-0203
2017-0215
INTRODUCED BY: LARRY COCHRAN, PARISH PRESIDENT
(DEPARTMENT OF PUBLIC WORKS)
ORDINANCE NO.
Title
An ordinance to approve and authorize the execution of a professional service multi-phase project engineering contract with EVANS-GRAVES ENGINEERS, INC., for providing all necessary professional, engineering services to design and oversee the construction of the transportation redevelopment phase & drainage portion of the infrastructure & public spaces redevelopment phase of Parish Project Number P140201; Titled PAUL MAILLARD RD (LA 52) CORRIDOR REVITALIZATION PLAN.
Body
WHEREAS, the St. Charles Parish Council desires to have the following project undertaken:
PROJECT DESCRIPTION:
The drainage infrastructure and transportation portions of the redevelopment phases of the aforementioned project involves re-designing LA52 using the Louisiana Department of Transportation and Development (LADOTD) "complete streets" approach. The proposed "complete streets" improvements requires that all open ditch drainage be converted to closed drainage in order accommodate the roadway transportation improvements, landscaping, and the construction of a multi-use pathway and/or pedestrian sidewalk; and,
WHEREAS, the engineering services for Parish Project Number P141201 will include but will not be limited to serving as St. Charles Parish's professional engineering representative for the project; providing professional engineering consultation and advice, furnishing all required civil, geotechnical, mechanical, electrical, instrumentation & control engineering design services and supplementary services; providing for construction inspection and administration; closing out each construction project including furnishing stamped drawings to serve as parish "as built" plans as stipulated via contract or task order; and,
WHEREAS, work under the aforementioned contract will be assigned via individual task order as required for the continuation of the capital improvement pro...