logo  ST. CHARLES PARISH, LA
File #: 2014-0279    Version: 1 Name: Change Order No. 2 for Project No. P080905-3B, Willowridge Levee - Phase I, State Project No.H.009257, as part of the West Bank Hurricane Protection Levee Project
Type: Ordinance Status: Enacted
File created: 9/2/2014 In control: Parish Council
On agenda: 9/15/2014 Final action: 9/15/2014
Enactment date: Enactment #: 14-9-10
Title: An ordinance approving and authorizing the execution of Change Order No. 2 for Project No. P080905-3B, Willowridge Levee - Phase I, State Project No.H.009257, as part of the West Bank Hurricane Protection Levee Project, to decrease the contract amount by $286,148.00 and increase the contract time by two (2) days.
Sponsors: V.J. St. Pierre Jr., Department of Public Works
Indexes: Floods, Hurricane Protection Levee (WB - Willowridge Levee Imp., Ph. I)
Attachments: 1. 2014-0279 Introduction of Change Order No. 2 for Willowridge Levee Project P080905-3B, 2. 2014-0279 Change Order-F, 3. 2014-0279 Final Ord 14-9-10 with Change Order
Related files: 2013-0408, 2000-0144, 1999-5052, 2012-0294, 2013-0262, 2011-0088, 2011-0257, 2013-0407, 2011-0057, 2011-0058, 2011-0233, 2012-0081, 2013-0411, 2014-0084, 2008-0418, 2015-0104, 2015-0105, 2015-0106, 2015-0108, 2015-0109, 2015-0116, 2015-0146, 2015-0205, 2015-0308, 2015-0309, 2015-0315, 2015-0340, 2017-0227
2014-0279
INTRODUCED BY: V.J. ST. PIERRE, JR., PARISH PRESIDENT
(DEPARTMENT OF PUBLIC WORKS)
ORDINANCE NO. ____________
title
An ordinance approving and authorizing the execution of Change Order No. 2 for Project No. P080905-3B, Willowridge Levee - Phase I, State Project No.H.009257, as part of the West Bank Hurricane Protection Levee Project, to decrease the contract amount by $286,148.00 and increase the contract time by two (2) days.
body
WHEREAS, Ordinance No. 13-11-6, adopted November 18, 2013, by the St. Charles Parish Council, approved and authorized the execution of a contract Southern Delta Construction, LLC for Project No. P080905-3B, Willowridge Levee - Phase I, State Project No.H.009257, in the amount of $5,785,551.00; and,
WHEREAS, Ordinance No. 14-4-1, adopted April 7, 2014, by the St. Charles Parish Council, approved and authorized Change Order No. 1 to the contract with Southern Delta Construction, LLC for Project No. P080905-3B, Willowridge Levee - Phase I, State Project No.H.009257, to increase the contract amount to $6,000,151.00 and the contract days to 457 days; and,
WHEREAS, Change Order No. 2 is a result of a change within the scope of the contract to remove/dispose of additional trees within the Willowridge Levee servitude, but outside of the clearing area designated in the Construction contract; and,
WHEREAS, Change Order No. 2 also includes the removal of the Peterson Culverts replacements and installation of slide gates from the scope of the contract due the location of the St Charles Parish Wastewater sewer force main and the potential to damage the sewer forced main with the designed pile foundation. St Charles Parish will utilize Parish equipment and labor to replace the existing culverts and install slide gates with a Parish designed system to minimize any impact to the St Charles Parish Wastewater sewer force main; and,
WHEREAS, the decrease in contract amount by $286,148.00 is a result of the decrease in seven (7...

Click here for full text