logo  ST. CHARLES PARISH, LA
File #: 2011-0114    Version: 1 Name: Task Order under a previously approved Multiphase Contract for Engineering Services with Principal Engineering Inc. for Fairfield and Oakland Pump Stations Upgrade
Type: Ordinance Status: Enacted
File created: 3/21/2011 In control: Parish Council
On agenda: Final action: 4/4/2011
Enactment date: 4/4/2011 Enactment #: 11-4-17
Title: An ordinance to approve and authorize the execution of a Task Order under a previously approved Multiphase Contract for Engineering Services with Principal Engineering Inc. for necessary professional engineering services associated with Parish Project No. P090301 Fairfield and Oakland Pump Stations Upgrade.
Sponsors: V.J. St. Pierre Jr., Department of Public Works
Indexes: DRO (Fairfield and Oakland Pump Stations Upgrade)
Attachments: 1. Task Order Oakland Fairfield PS.doc, 2. 2011-0114 Task Order-F, 3. 2011-0114 Final Ord 11-4-17 with Task Order
Related files: 2011-0224, 2011-0232, 2009-0133, 2014-0319, 2018-0191, 2015-0145, 2024-0018, 2022-0083
2011-0114
INTRODUCED BY: V.J. ST. PIERRE, JR., PARISH PRESIDENT
(DEPARTMENT OF PUBLIC WORKS)
ORDINANCE NO.
Title
An ordinance to approve and authorize the execution of a Task Order under a previously approved Multiphase Contract for Engineering Services with Principal Engineering Inc. for necessary professional engineering services associated with Parish Project No. P090301 Fairfield and Oakland Pump Stations Upgrade.
Body
WHEREAS, the St Charles Parish Council has previously approved Ordinance 09-4-17 which authorized the Drainage Study to be performed for the Oakland and Fairfield Areas. This ordinance will request the approval to implement the Engineering Design for the recommendations from that study; and,
WHEREAS, the St. Charles Parish Council desires to have the following described projects undertaken:
PROJECT DESCRIPTION:
Engineering Services for Parish Project No. P090301 Fairfield and Oakland Pump Stations Upgrade project. The service will include but will not be limited to serving as Owner's professional engineering representative for the Project, providing professional engineering consultation and advice, and furnishing customary civil, geotechnical, structural, mechanical, electrical, instrumentation and control engineering services and construction engineering and inspection; and,
WHEREAS, the opinion of probable project budget is as follows:
Engineering Services(Basic and Inspection) $ 350,480.00
Construction $ 2,200,000.00
Other Project Cost $ 220,000.00
Advertising, Recordation, Land Acquisition,
Right-of-Ways, Permits, Surveying, Soil Testing, etc.

TOTAL PROJECT BUDGET $ 2,770,480.00
THE ST. CHARLES PARISH COUNCIL HEREBY ORDAINS:
SECTION I. That the Task Order for Engineering Services under the Multiphase Project Contract for Engineering Services between Principal Engineering Inc. and the Parish of St. Charles is hereby approved.
SECTION II. That the Paris...

Click here for full text