2019-0246
INTRODUCED BY: LARRY COCHRAN, PARISH PRESIDENT
(DEPARTMENT OF PUBLIC WORKS)
ORDINANCE NO. _____________
Title
An ordinance to approve and authorize the execution of a professional service agreement with Pivotal Engineering, LLC, for providing all necessary professional topographic surveying and engineering services for a conceptual plan to replace the Turtle Pond Pump Station. (Parish Project Number P190801).
Body
WHEREAS, the existing pump station that serves the Turtle Pond drainage area is in poor condition and needs replacement, and,
WHEREAS, the Department of Public Works desires to hire an engineering consultant to prepare a conceptual plan that shows the proposed replacement of the pump station including equipment selection and site layout, and,
WHEREAS, the attached agreement between Pivotal Engineering and the Parish describes the proposed topographic surveying and engineering services and compensation for the proposed project.
THE ST. CHARLES PARISH COUNCIL HEREBY ORDAINS:
SECTION I. That the Professional Services Agreement between Pivotal Engineering, LLC and St. Charles Parish is hereby approved and accepted.
SECTION II. That the Parish President is hereby authorized to execute said Professional Services Agreement on behalf of St. Charles Parish.
The foregoing ordinance having been submitted to a vote, the vote thereon was as follows:
And the ordinance was declared adopted this day of , 2019, to become effective five (5) days after publication in the Official Journal.