An ordinance to approve and authorize the execution of a Construction Contract with Sealevel Construction, Inc. for Project No. P080905-6C, grant reference Project No. HMGP#4080-089-0002, FEMA-4080-DR-LA, Project #3, Magnolia Ridge Drainage Pump Station Project, as part of the West Bank Hurricane Protection Levee Project, in the amount of $10,199,228.00.
Body
WHEREAS, sealed bids were received by St. Charles Parish on October 30, 2017 for Project No. P080905-6C, grant reference Project No. HMGP#4080-089-0002, FEMA-4080-DR-LA, Project #3, Magnolia Ridge Drainage Pump Station Project; and,
WHEREAS, Burk-Kleinpeter, Inc., Michael G. Jackson, P.E., the Engineer for the Project, has reviewed the bids and recommended that the Contract be awarded to the lowest responsive bidder, Sealevel Construction, Inc. in the amount of $10,199,228.00; and,
WHEREAS, the Magnolia Ridge Drainage Pump Station Project, as part of the West Bank Hurricane Protection Levee Project, will provide flood protection to approximately 231 residences, 41 businesses, 2 public buildings, and 25 school/hospital/church buildings located within the Magnolia Ridge watershed area; and,
WHEREAS, the Magnolia Ridge Drainage Pump Station Project consists of the installation of a new Drainage Pump Station, intake channel and discharge over the newly constructed levee being connected to the Magnolia Ridge Levee system protecting Magnolia Ridge watershed area. The project includes the purchase and installation of four (4) 125 cfs pumps, diesel engine pump drivers, standby generator, station concrete structure, access road, intake channel, discharge piping and basin, automated bar screen cleaners, excavation of a retention area adjacent to the pump station, levee constructed around the pump station and tied into the existing Magnolia Ridge Levee ; and,
WHEREAS, Ordinance No. 17-1-8 on January...