logo  ST. CHARLES PARISH, LA
File #: 2014-0437    Version: 1 Name: Contract with Industrial & Mechanical Contractors, Inc. for Project P090904 Mimosa Drainage Improvements in the amount of $735,156.50
Type: Ordinance Status: Enacted
File created: 1/12/2015 In control: Parish Council
On agenda: 1/26/2015 Final action: 1/26/2015
Enactment date: Enactment #: 15-1-8 AMENDED
Title: An ordinance to approve and authorize the execution of a contract with Industrial & Mechanical Contractors, Inc. for Project P090904 Mimosa Drainage Improvements in the amount of $735,156.50.
Sponsors: V.J. St. Pierre Jr., Department of Public Works
Indexes: DRO (Mimosa and Lagattuta Drg. Imp.), Public Works (Dept. of)
Attachments: 1. 2014-0437 Mimosa Drainage contract, 2. 2014-0437 Misc. Info, 3. 2014-0437 Contract-F, 4. 2014-0437 Notice to Proceed-F, 5. 2014-0437 Final Ord 15-1-8 with Contract, 6. 2014-0437 Notice of Contract-F
Related files: 2012-0150, 2012-0034, 2009-0420, 2022-0238, 2021-0336, 2021-0218
2014-0437
INTRODUCED BY: V.J. ST. PIERRE, JR., PARISH PRESIDENT
(DEPARTMENT OF PUBLIC WORKS)
ORDINANCE NO. _____
title
An ordinance to approve and authorize the execution of a contract with Industrial & Mechanical Contractors, Inc. for Project P090904 Mimosa Drainage Improvements in the amount of $735,156.50.
body
WHEREAS, sealed bids were received by St Charles Parish December 17, 2014 for Project P090904 Mimosa Drainage Improvements; and,
WHEREAS, Buchart Horn, Inc., the Engineer for the Project has reviewed the bids and recommended that the contract be awarded to the low bidder, Industrial & Mechanical Contractors, Inc. in the amount of $735,156.50 as the base bid; and,
WHEREAS, installation of this project will be a contract comprised of installation of a new drainage pumping station including a 12' x 15' reinforced concrete wet well, two (2) 24" axial flow propeller pumps with 75HP motors, 30" welded steel discharge piping, and all associated site and electrical work; and capacity improvements to the existing drainage system including the installation of 1138 LF of 48" storm drainage pipe, 12 catch basins, 8 junction boxes, 478 LF of ditch grading, and a concrete flume with bar screen; and all associated demolition and restoration work. The project classification is: Heavy Construction. Project is on the West Bank of St. Charles Parish, Louisiana.
THE ST. CHARLES PARISH COUNCIL HEREBY ORDAINS:
SECTION I. That the bid of Industrial & Mechanical Contractors, Inc. for the construction of Project P090904 Mimosa Drainage Improvements, be hereby approved and accepted, in the amount of $735,156.50.
SECTION II. That the Parish President is hereby authorized to execute said Contract on behalf of St. Charles Parish.
The foregoing ordinance having been submitted to a vote, the vote thereon was as follows:




And the ordinance was declared adopted this _____ day of ___________, 2015, to become effective five (5) days after public...