2019-0163
INTRODUCED BY: LARRY COCHRAN, PARISH PRESIDENT
(DEPARTMENT OF PUBLIC WORKS)
ORDINANCE NO. _____
Title
An ordinance approving and authorizing the execution of Change Order No. 1 for the Ellington Drainage Pump Station Project No. P080905-5D, grant reference Project No. H.013148, as part of the West Bank Hurricane Protection Levee Project, to increase the contract amount by $36,252.00 and increase the contract time by fifty nine (59) days.
Body
WHEREAS, Ordinance No. 18-11-1, adopted November 5, 2018, by the St. Charles Parish Council, approved and authorized the execution of a contract with Sealevel Construction, Inc. for the Ellington Drainage Pump Station Project No. P080905-5D, grant reference Project No. H.013148, in the amount of $8,288,890.00; and,
WHEREAS, Change Order No. 1 is a result of changes within the scope of the contract to address geotech conditions not previously identified and to adjust pump station systems' design to fit field conditions within the Construction Contract; and,
WHEREAS, the increase in the contract amount by $36,252.00 is a result of a decrease in cost for one (1) bid line item, an increase in cost for one (1) bid line item, the addition of three (3) bid line items; and,
WHEREAS, the increase in contract time by fifty nine (59) days is a result of additional work activities required to complete the project.
THE ST. CHARLES PARISH COUNCIL HEREBY ORDAINS,
SECTION I. That Change Order No. 1 for the Ellington Drainage Pump Station Project No. P080905-5D, grant reference Project No. H.013148, as part of the West Bank Hurricane Protection Levee Project, to increase the contract amount by $36,252.00 and increase the contract time of fifty nine (59) days is hereby approved and accepted.
SECTION II. That the Parish President is hereby authorized to execute said Change Order on behalf of St. Charles Parish.
The foregoing ordinance having been submitted to a vote, the vote thereon was as follows:
And the ...