2011-0052
INTRODUCED BY: MARCUS M. LAMBERT, COUNCILMAN, DISTRICT VI
V.J. ST. PIERRE, JR., PARISH PRESIDENT
(DEPARTMENT OF WASTEWATER)
ORDINANCE NO. __________
Title
An ordinance to approve and authorize the execution of a contract with Sealevel Construction, Inc for project, Thoroughbred Lift Station #5931 Improvements, in the amount of $159,000.00.
Body
WHEREAS, sealed bids were received by St. Charles Parish on February 3, 2011 for project Thoroughbred Lift Station #5931 Improvements; and,
WHEREAS, C. J. Savoie Consulting Engineers, Inc., the Engineer for the Project, have reviewed the bids and recommend that the Contract be awarded to the low bidder, Sealevel Construction, Inc., in the amount of $159,000.00; and,
WHEREAS, currently, the lift station discharges into a gravity system and during periods of high flow, has caused manhole overflows; and,
WHEREAS, this project will eliminate these overflows by removing the lift station discharge from the gravity system, installing new pumps and force main, and route the new discharge line into the lift station located on Evangeline Road.
THE ST. CHARLES PARISH COUNCIL HEREBY ORDAINS:
SECTION I. That the bid of Sealevel Construction, Inc, for the construction of project Thoroughbred Lift Station #5931 Improvements, is hereby approved and accepted in the amount of $159,000.00.
SECTION II. That the Parish President is hereby authorized to execute said contract documents on behalf of St. Charles Parish.
Vote
The foregoing ordinance having been submitted to a vote, the vote thereon was as follows:
And the ordinance was declared adopted this ______ day of __________, 2011, to become effective five (5) days after publication in the Official Journal.
CHAIRMAN:______________________________________________
SECRETARY:_____________________________________________
DLVD/PARISH PRESIDENT:_________________________________
APPROVED:______________ DISAPPROVED:__________________
PARISH ...
Click here for full text