2014-0106
| 1 | | | Discussion Item | Department of Public Safety will present the revised All Hazards Emergency Operations Plan | Discussed. | |
Action details
|
Not available
|
2014-0120
| 1 | | Directing the PP to secure the permanent servitudes required for the future maintenance of the Parish maintained drainage along the western side of St. Gertrude Catholic Church from LA 631 Spur (Old U.S. 90) to the Grand Marais and to complete the install | Ordinance | An ordinance directing the Parish President to secure the permanent servitudes required for the future maintenance of the Parish maintained drainage along the western side of St. Gertrude Catholic Church from LA 631 Spur (Old U.S. 90) to the Grand Marais and to complete the installation of the subsurface drainage to the Grand Marais. | Discussed. | |
Action details
|
Not available
|